Mode Lecture seule - Les modifications sont désactivées
Quality & HSE
Manage quality control and safety
Pass Rate
40%
2 passed inspections
Average Score
68
Total Defects
11
1 failed inspections
HSE Incidents
3
This month
Quality Control Inspections
Track and manage quality control activities
Inspection ID | Date | Site/Area | Type | Material/Process | Inspector | Score | Defects | Result | Priority | Actions |
---|---|---|---|---|---|---|---|---|---|---|
QC-2024-001 | 2024-06-15 | TRI-K Processing Plant | Material Inspection Incoming Materials | Steel Reinforcement Bars BAT-2024-0456 | Marie Tshombe | 95% | 0 | passed | high | |
QC-2024-002 | 2024-06-14 | BOTO Gold Processing | Process Audit Production Process | Gold Ore Processing PRD-2024-0892 | Pierre Kabongo | 82% | 3 | passed with-observations | medium | |
QC-2024-003 | 2024-06-13 | BRAHMAS Construction Site | Safety Inspection HSE Compliance | PPE Equipment HSE-2024-0234 | David Mwamba | 65% | 8 | failed | critical | |
QC-2024-004 | 2024-06-12 | TRI-K Mining Operations | Equipment Calibration Measurement Tools | Weighing Scales CAL-2024-0089 | Sarah Ilunga | 98% | 0 | passed | low | |
QC-2024-005 | 2024-06-11 | Central Laboratory | Chemical Analysis Raw Materials | Copper Ore Sample LAB-2024-1234 | Jean Baptiste | 0% | 0 | pending | medium |