Mode Lecture seule - Les modifications sont désactivées
Mining Operations
Manage mining operations and production
Daily Production
8,450 tonnes
+5.2% from yesterday
92% of daily target
Average Grade
2.42 g/t Au
Above reserve grade
Min: 1.85
Max: 3.20
Strip Ratio
2.88:1
Target: 2.75:1
Ore: 8,450 tWaste: 24,300 t
Recovery Rate
91.5%
-0.8% from last week
● Oxide: 94%● Transition: 91%● Sulfide: 88%
Weekly Production Trend
Ore and waste tonnages with grade overlay
Production by Site
Percentage contribution today
Ore Grade Distribution
Number of samples by grade range
Rehabilitation Progress
Planned vs Actual (Hectares)
Mining Faces Management
Track and manage active mining fronts with tonnage extraction
Face ID | Name / Site | Current Bench | Status | Progress | Extracted / Planned | Safety Score | Actions |
---|---|---|---|---|---|---|---|
MF001 | North Pit - Face A TRI-K | RL 1250 | active | 58.3% | 87,500 t / 150,000 t | 98% | |
MF002 | South Extension - B2 BOTO | RL 1180 | active | 22.5% | 45,000 t / 200,000 t | 95% | |
MF003 | West Cutback - Level 3 BRAHMAS | RL 1320 | maintenance | 68.6% | 120,000 t / 175,000 t | 96% |