Construction
Manage construction projects and operations
Concrete Poured Today
425 m³
Trucks Delivered: 18
Avg Slump: 120mm
Steel Installed
85.4 tonnes
This Week
Certified: 100%
Formwork Utilization
78%
Rotations Avg: 6
Available: 250 m²
Waste Diverted
82%
From Landfill
Tonnes Recycled: 125t
Quality Target: All concrete must achieve 90% of design strength at 7 days and 100% at 28 days.
Concrete Pour Management
Track concrete deliveries with slump tests and cube strength results
Pour Number | Site / Location | Element | Volume | Grade | Slump Tests | Strength | Status | Actions |
---|---|---|---|---|---|---|---|---|
TK-CON-2024-018 | TRI-K Block A - Level 3 | Floor Slab | 125 m³ | C35/45 | 3/4 Avg: 125mm | Passed | completed | |
BO-CON-2024-012 | BOTO Foundation - Grid 5-8 | Pile Caps | 85 m³ | C40/50 | 3/3 Avg: 100mm | Pending | in progress |
Slump Test Trends
Slump consistency throughout the day
Strength Development
Compressive strength over time
Monthly Concrete Volumes
Volume by grade and month